SVT #1210 in classic traction orange

The Southern Vermont Traction Company is an interurban railroad that operated a collection of radial lines centered in Bennington, VT, and two ex-Berkshire Street Railway lines that met Lee Center, MA.

Like the other longer-lived New England interurbans, it pivoted away from passenger traffic before the 1920s and freight kept it profitable over the losses of the passenger business until the late 1930s, when it finally succumbed to its debts but was rescued by a merger with the PV&T just before WW2.

In the 1950s, it shrunk down to a single branch operating between Bennington and Pownel, MA before expanding again in 1962 when it purchased the Bennington to North Bennington stub of the ex-Rutland Railroad’s Chatham Division. It continues to operate today, interchanging with the PV&T and B&M in Pownel and the VTR in North Bennington.

And, yes, it’s still under wire, as befitting a PV&T subsidiary.

The history of the Southern Vermont Traction Company

The Bennington & Woodford Electric Railway

The story of the Southern Vermont Traction company started with the demise of the Bennington & Woodford Electric Railway, which shut down in 1898 and was almost immediately purchased by promoters who wanted to build an interurban line up and over the Green Mountains to Wilmington, VT.

This new railway (the Bennington & Wilmington Railway) was aware of how fickle passenger traffic could be until the interurban had established itself as reliable, so built the new line as a combined passenger and freight railway (mainly to carry finished lumber from the sawmills at Mountain Mills, though a decent amount of carload & lcl freight developed in the next 10 years) and, unlike the unfortunate B&WER, was comfortably profitable.

(The upper end of the B&WER, from Woodford up to a resort on Glastonbury Mountain, had been washed out in 1898 – thus the demise of the railway – and was never rebuilt despite verbal assurances that it would be, and lingered for twenty years as a proposed extension until the post-WW2 decline in passenger traffic convinced the B&WRy to concentrate of freight instead.)

In 1908, the B&WRy extended their line across the state to Brattleboro, and started interchanging with the CV, B&M, and PV&T as well as their existing Rutland (Bennington) and HT&W (Wilmington) interchanges.

The Vermont Company

While the B&WRy was hauling freight east, the Vermont Company, which had purchased (and then leased to the Berkshire Street Railway) two lines running west (the Bennington & Hoosick Valley) and south (the Bennington & North Adams Street Railway) was having financial problems because the leases were not quite keeping up with bond payments. The B&WRy thought that they had enough money to cover redeeming most of those bonds, so they proposed a merger with the temporarily embarrassed VC, and, in 1915, formed the Southern Vermont Traction Company, which still only operated east of Bennington, but had a steady supplemental income from the lease payments.

WW1, and the consequences of improved highways

During WW1, the new SVT was, like all of the other traction companies in the region, squeezed by wartime austerity and the increasing availability of private automobiles. By the end of the war, the Berkshire Street Railway was suffering, and in 1922 surrendered their lease of the SVT’s east & south branches.

These lines were in fairly ragged shape, but the SVT decided that they might be able to make a profit on them by pivoting to freight operation. So more motors were ordered (wooden express cars, but with heavy-duty motors and controllers so they could haul freight cars) and the lines went forth and started to be successful freight lines.

Pride, it usually goes before a fall

Needless to say, this made the SVT feel like they had found The Solution to the woes that were bringing down all of the other interurban lines in the region, and they started to get greedy.

In 1925, the SVT purchased both the Arlington Traction Company (a line running north from Burlington to Arlington, Vermont, which was also hauling freight but had overestimated the durability of passenger traffic and was now stuck with a fleet of new steel interurbans that were woefully underutilized) and the Berkshire Street Railway’s branch from Lee Center, MA to to Huntington, MA (a line that was intended to connect to the Springfield Street Railway’s Huntington branch for through running, but which was blocked by the state legislature. This line had been abandoned in 1923, but the track was still in place and the SVT thought that they could set up a freight interchange with the Boston & Albany instead. However, a pro-forma meeting with the legislature revealed that the reason behind the prohibition was that the BSR was controlled by the New Haven, and now that the “Huckleberry Line” was owned by someone else a connection would be allowed. This connection was quickly made (the SVT and Springfield Street Railway branches were separated by a 10(!) foot gap in Huntington!) and the SVT & Springfield Street Railway ended up operating a joint interurban line for the next 20 years, only discontinuing it when National City Lines was finally successful in replacing their half of the line with busses in 1945.

These purchases were not immediately mistakes, but the SVT took on a lot of debt to purchase (and, in the case of the Huntington branch, rehabilitate) the two lines, so ended up running a lot closer to the edge than they should have.

And then came the great depression

Well, everybody knows what happened in 1929. On the ground, the implosion of Wall Street didn’t have much immediate effect, but the money supply dried up just like that and many of the surviving interurban lines in Western Mass drowned in a sea of red ink.

The Berkshire Street Railway was one of them; in 1932, it threw in the towel and went out of business. The SVT, still thinking they were immune to the fatal disease that was killing all of the other interurbans in Vermont & Western Mass, purchased the BSR’s line from Lee Center to Pittsfield and, ignoring the swirling vortex of debt they were in, started operating it for freight as well.

And then things got much worse

However, highways, private automobiles, and the depression started taking out the SVT’s more marginal lines.

The first line that was abandoned was the ex-B&NA’s line from Pownel to Adams, which was scrapped in 1932 to help finance the Lee Center to Pittsfield purchase. Four years later saw end of the line from Bennington to Hoosick Falls, followed by the Lee Center to Pittsfield line, which had turned out to add a fatal amount of debt to the company books.

And then, in 1938, the SVT gave up altogether and filed for abandonment of everything.

The angel investor

When the abandonment petition showed up, the PV&T, which was itself engaged in an absurd project of buying marginal interurbans, proposed a merger where they’d get the SVT in exchange for clearing the debts of the railway.

It was embarrassing just how quickly the stockholders accepted this offer, even though it meant that they were taking a severe haircut in the process. And them, at the end of 1938, the PV&T moved in and started operating their new lines, just in time for WW2 to start up.

Traffic volumes immediately shot up on the two separated divisions of the SVT, and those Arlington Traction Company steel coaches were pressed back into service and spent the next 6 years hauling passenger traffic while the old wooden express motors, plus a large handful of freight motors from other abandoned interurbans, started working themselves to death hauling freight.

And then there was peace

During the war austerity measures ruled, so by the end of hostilities the SVT was in pretty bad shape. The PV&T had wanted to reelectrify the lines at 3000vdc during the war, but had concentrated on other mainline projcts instead, and didn’t start changing line tensions until 1948, when the line from Pownel to Bennington was upgraded to 3000vdc and 2 of the PV&T’s class A motors were moved to the SVT.

But, even as the PV&T started doing their voltage supply upgrades, the absolute bottom fell out.

In 1948, the B&WRy’s extension from Wilmington to Brattleboro was abandoned in favor of routing interchange traffic to Pownel, and then the march of abandonments began again;

In 1951, the rest of the B&WRy was abandoned, followed, in 1952, by the ex-BSR Lee Center to Huntington line, and then, in 1955, by the entire Arlington Traction Company, leaving only the line from Bennington to Pownel in operation. This line had, as already mentioned, been converted to 3000vdc tension, so was in fairly good shape and wasn’t looking down the barrel of having to do massive rehabilitation as all the traffic fled to the newly improved highways, and continued to operate as the scrappers ripped out the rest of the interurban.

Exit the Rutland, stage left

The stub of the SVT had settled down to a comfortable, if somewhat lean, existance that was not humiliating for the PV&T’s head office to think about, when, in 1961, the Rutland Railroad had a strike and was immediately abandoned.

The SVT took the opportunity to purchase the remains of the Rutland’s Chatham Division (the stub between Bennington & North Bennington, which still had a good amount of traffic) and, by 1963, when the state of Vermont had purchased the rest of the Rutland and leased it to the newly formed Vermont Railway, had electrified it and integrated it into the SVT.

Finally settling down to an uneventful existance

And this, believe it or not, was the end of the excitement. After 1963, the SVT had an uneventful life as a PV&T branch line, and operates over the same trackage that it had in December 1963.

In the mid-1970s, the City of Bennington got worked up about the freight trains running down Main Street in the middle of the night, and tried to force the SVT to abandon that trackage by demanding that they adhere to the original franchise of the Bennington & North Adams and operate passenger service. The SVT shrugged, said OK, and leased two PV&T class 6P coaches away from the commuter service they were running out their last miles on over to the SVT and operated them on a frequent service between North Bennington to Pownel until 1990, when the embarassment of seeing absolutely empty coaches traversing Main Street every hour of the day convinced the city to modify the franchise.

In 1995, the SVT was given the keys to the city as Bennington’s own trolley line, and as long as they continue to not operate on the streets during the day they are treated as a nostalgic treat.

Current operations are that the SVT interchanges with the VTR north of the city on M/W/F, moves the single motor they need across town, then interchanges with the PV&T and B&M south of the city on T/Th. (no operations on the weekend, though; Sunday was always a day off, but in 2010 an Orthodox Jew bid onto the SVT’s crew and when she mentioned that Saturday was the Sabbath the SVT trimmed the south interchange back to weekdays only, and never reverted it when she transferred back off the SVT onto the PV&T’s mainline crew pool.)

Carbarns

When the SVT operated their original 4 lines out of Bennington, they used a carbarn at the intersection of Park & County Streets. After the Pownel line had the tension increased to 3000vdc, a small carbarn was built at Pownel Junction and the Park & County carbarn was used for storage (and then isolated when the wave of abandonments reduced the SVT down to that stub; the carbarn lasted until 1972, when it was demolished when Mount Anthony Union High School wanted to put an athletic field on the site.)

After the Rutland’s bankruptcy and the SVT’s purchase of the line from Bennington to North Bennington the old Rutland yard at River & Lincoln was pretty much unused, so when the passenger franchise was enforced another carbarn was built to hold the two class 6P coaches, and when THAT stopped the SVT moved out of their Pownel carbarn and into this new-but-unused one that actually had an inspection pit instead of having to send the motor to Albany when it needed work done.

Further south, on the ex-Berkshire lines radiating from Lee Center, MA, there was no actual carbarn, but there was a car yard south of the town (just west of the line down Marble Street, pinned between the SVT and the New Haven’s Berkshire Line) that had a single stall shop and a three stall canopy. This yard outlived the SVT’s southern district, but not by much, because it was directly on the route of the Mass Pike as it crossed the Berkshires, and today is buried under the embankment that the Mass Pike sits atop.

Company offices

The SVT’s head offices were always in Bennington; first they were in an annex to the County Street shops, then they moved to offices on Main St, and post PV&T merger they first returned to County Street, and after the post-war abandonment of most of the SVT finally relocated to a suite in the the Rutland station, where they remain today. When the SVT purchased the stub of the Chatham Division, the depot came along with the deal, but was sold soon thereafter, and the SVT has leased space there since then.

(Post-PV&T merger, the SVT’s management is a single freight agent, because even though the PV&T, et seq, want to preserve connections to the communities that PV&T subsidiaries operate in, but doesn’t want to get too carried away. So the SVT’s HQ is now a three room suite that contains the freight agents, current records, and a crew room, while the rest of the station has been offices, a restaurant, and most recently the HQ of an engineering firm.)

Roster

When the Bennington & Wilmington was built, they purchased 6 coaches and 8 express motors from Laconia Car Company, with a second order of 4 Laconia coaches and 6 St Louis Car boxcabs after the line was extended across the state to Brattleboro.

In 1920, the SVT went to Baldwin and ordered a pair of class D steeplecabs to supplement the boxcabs on the Bennington & Wilmington.

When the Berkshire Street Railway gave up their leases of the old Vermont Company properties, the SVT moved all of their Laconia express motors over to these lines, then went back to Laconia one last time to buy 2 more express motors.

When the Arlington Traction Company was taken over, it had 10 Cincinnati curve-side coaches on the roster, plus 5 Brill boxcabs; all of the curve-side coaches and 3 of the Brill motors were immediately sent south to operate on the two ex-BSR lines, which the SVT wanted to modernise to emphasise that the new management was not like the old one.

After WW2, the PV&T first moved a pair of class A boxcabs, then the solitary ex-Fell class 276 steeplecab to the retensioned Pownel line. They intended to retension the rest of the SVT, but the collapse of freight and passenger traffic on those lines made the matter moot. (The ex-Arlington Traction Company line was about halfway in the process of preparing for the voltage changeover when the Arlington woolen mill that was the major customer closed and made the line redundant.)

Almost none of the SVT’s rolling stock was renumbered into the PV&T’s unified roster due to how quickly the traffic base collapsed after WW2. The six St Louis Car boxcabs that were operating on the line to Brattleboro had been renumbered immediately after the merger, but WW2 stopped any other renumberings, and then it was too late.

Between 1955 and 2013, the SVT used a rotating cast of PV&T power, with the only long-term resident being 276, which operated continuously from 1946 until 2007. In 2013, the SVT purchased class O #1210, which is currently the only motive power on the line.

All-time SVT Roster

No. Type Builder Built Notes
1-8 passenger Laconia Car Company 1899 Retired 1934, unretired 1939, retired (again) 1946
(second) 1,2 class 6P Pullman 1928 Ex-PV&T 609P,681P; in service 1975-1990
E1-E8 express motor Laconia Car Company 1907 Retired 1937
9-14 passenger Laconia Car Company 1907 Retired 1934
E9-E10 class 283 St Louis Car 1907 Renumbered #68-69 1928, to PV&T #284-285 1939, retired 1948
E11 class 283 St Louis Car 1907 Renumbered #70 1928, to PV&T #286 1939, retired 1952
E12-E14 class 283 St Louis Car 1907 Renumbered #71-74 1928, to PV&T #287-289 1939, retired 1955
E20-E21 B-W class D Baldwin-Westinghouse 1920 Renumbered #80-81 1928, retired 1952
20-23 passenger Cincinnati Car Company 1922 Cincinnati curve-side cars; ex-Arlington Traction 1-4, retired 1952
24-25 passenger Cincinnati Car Company 1922 ex-Arlington Traction 5,6, retired 1937
26-28 passenger Cincinnati Car Company 1922 ex-Arlington Traction 7-9, retired 1952
29 passenger Cincinnati Car Company 1922 ex-Arlington Traction 10, to Seashore Trolley Museum 1955
E30-E33 express motor Brill 1923 ex-Arlington Traction 11-14, rebuilt as steeplecabs & renumbered #90-93 1927, retired 1952
W550-W564 steeplecab Wason 1927 ex-Springfield Street Railway 550-564; purchased for WW2 service and converted to steeplecabs. These cars were not well suited for freight service even after rebuilding, and only 4 survived to the end of the war
276 class 276 Alco & GE 1931 assigned to the SVT after remanufacturing 1946 (after the PV&T’s Mount Cube incline was abandoned), retired 2007
204 class A Alco & GE 1912 periodically assigned to the SVT until 2011
207 class A Alco & GE 1912 periodically assigned to the SVT until 2012, when it went to Musée Ferroviaire Canadien
240 class 240 Baldwin-Westinghouse 1930 assigned to the SVT 2011-2013
1210 class O Portland 2013 In service
  • Copyright © 2024 by Jessica L. Parsons (orc@pell.portland.or.us) unless otherwise noted
    Wed Jun 24 01:57:52 PDT 2009